Free C22 Asbestos Abatement Exam

Welcome to your free C-22 Asbestos Abatement Quiz

REQUIRED - Enter your email address to receive a printable copy of your test results.
1. 
You are conducting an air sample using TEM. You draw 2,000 liters of air through each filter at 5 liters per minute. You collect 6 samples from inside your work site. One field blank and one laboratory blank are included in the analysis. According to the EPA, you have proceeded__________.

2. 
You are conducting an air sample using TEM. You draw 3,500 liters of air through each filter at 5 liters per minute. You collect 6 samples from inside your work site. One field blank and one laboratory blank are included in the analysis. According to the EPA, you have proceeded__________.

3. 
You are conducting an air sample using PCM. You draw 480 liters of air through each filter at 1 liter per minute. You collect 6 samples from inside your work site. One field blank and one laboratory blank are included in the analysis. According to the EPA, you have proceeded__________.

4. 
The type of air-sampling test that detects the finest particles of asbestos is__________.

5. 
Which of the following is considered an administrative control of asbestos?

6. 
Signs warning of asbestos must be readable from__________.

7. 
The PCM method was used to detect extremely small particles of asbestos. This was__________.

8. 
A contractor conducts safety meetings with supervisors at quarterly intervals, and the supervisors hold tailgate meetings with workers every ten working days. These practices are__________.

9. 
Which of the following is not considered a proper asbestos-containing enclosure?

10. 
The asbestos contractor must tell the owner about__________.