Free C57 Well Drilling Exam

Welcome to your free C-57 Well Drilling Exam

REQUIRED - Enter your email address to receive a printable copy of your test results.
1. 
Welding equipment should not be grounded to a truck because:

2. 
All of the following statements are correct except:

3. 
The bad thing about jetting a well is:

4. 
When installing heat pumps, the contractor must consider water pooling around the pump. This can be resolved by:

5. 
What type of pump should be used in a sand well?

6. 
Which pressure range gets more water between cycle?

7. 
How does water circulate through a pump?

8. 
Which of the following is the most common cause of a drill hole becoming crooked?

9. 
What is the minimum clearance in front of a 240 V electrical panel?

10. 
Who determines the minimum required distance for a driller's mast from an electrical line?

11. 
What sort of PPE (personal protective equipment) is recommended when using cleaning solvent?

12. 
What should be done with lifelines, safety harnesses, and shock-absorbing lanyards that have been subjected to impact loading?

13. 
What is the longest standard length of a scaffold plank?

14. 
On a 120V circuit, what color is the (protective) ground wire?

15. 
What is the minimum distance apart that acetylene and oxygen cylinders must be stored?

16. 
Which of the following is a correct method for storing acetylene cylinders?

17. 
Which of the following is the best choice for hoisting a full gas cylinder?

18. 
Cylinders containing ______ shall not be taken into confined spaces.

19. 
A dry chemical or carbon dioxide fire extinguisher rated at least ______ must be kept near operations where bottled fuel gases are being used.

20. 
No more than ______ of paints, solvents, and chemicals may be stored in a room unless an approved safety storage cabinet is present.