In order to provide easy means of identification, where are ASTM specifications for rebar found?

Correct! Wrong!

How often does the Post-Tensioning Institute recommend post-tension stressing equipment be calibrated?

Correct! Wrong!

Which of the following items is used to reinforce concrete slabs on grade of 4” or less?

Correct! Wrong!

A contractor determines that a particular job will take three men an 8-hour day to install 50 feet of retaining wall reinforcement. The labor cost is $43.00 per man-hour and the wall is 300 feet long. What is the total labor cost for the job?

Correct! Wrong!

According to the Post-Tensioning Manual, which of the following should be used to repair tears in cable sheathing?

Correct! Wrong!

When post-tensioning, when should you cut the tendon?

Correct! Wrong!

What is the total weight of the bars if you need 6 rows of #4 bars, 40 ft long?

Correct! Wrong!

When installing horizontal and vertical bars in walls, ties should not be more than 4 ft to 6 ft apart in any direction with not less than _______ tie(s) to any one bar.

Correct! Wrong!

Expanded metal reinforcing mesh is only used for:

Correct! Wrong!

What should do you do after cutting the tendon?

Correct! Wrong!

Free C-50: Practice Quiz: Take our 2019 exam, see where you stand!
FAIL - You did not pass the trade portion of the C-50 Reinforcing Steel practice exam.

You need our help! Call us from 8am-10pm, Mon-Sat, for a free consultation. We promise you will be very glad you did!

Click Here to take the Law & Business exam

PASS- You have passed the trade portion of the C-50 Reinforcing Steel practice exam.

You did pretty well! Call us from 8am-10pm, Mon-Sat, for a free consultation. We promise you will be very glad you did!

Click Here to take the Law & Business exam

Share your Results: